• Categories
  • 2514
    804
    491
    483
    435
    192
    133
    103
    59
    51
    30
    26
    12
    11
    8
    491
    26
    51
    435
    133
    12
    30
    804
    11
    103
    483
    2514
    8
    192
    59

Selling to

  • 0
  • 0
  • 7
  • 0
  • 0
  • 0
  • 0
  • 8
  • 6
  • 90
  • 22
  • 2
  • 5
  • 7
  • 10
  • 5
  • 1
  • 14
  • 0
  • 0
  • 0
  • 0
  • 1
  • 1
  • 0
  • 29
  • 0
  • 7
  • 1
  • 0
  • 0
  • 6
  • 0
  • 81
  • 0
  • 0
  • 0
  • 6
  • 2698
  • 6
  • 0
  • 0
  • 7
  • 0
  • 6
  • 0
  • 5
  • 9
  • 0
  • 0
  • 10
  • 0
  • 6
  • 3
  • 9
  • 0
  • 2
  • 0
  • 0
  • 3
  • 0
  • 1
  • 0
  • 10
  • 61
  • 0
  • 0
  • 0
  • 2
  • 259
  • 2
  • 24
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 30
  • 9
  • 0
  • 881
  • 17
  • 3
  • 0
  • 3
  • 2
  • 113
  • 0
  • 92
  • 3
  • 1
  • 7
  • 0
  • 0
  • 1
  • 0
  • 0
  • 2
  • 0
  • 0
  • 0
  • 2
  • 8
  • 5
  • 1
  • 1
  • 0
  • 0
  • 18
  • 0
  • 0
  • 1
  • 0
  • 0
  • 0
  • 0
  • 13
  • 0
  • 0
  • 1
  • 1
  • 1
  • 6
  • 0
  • 2
  • 0
  • 0
  • 0
  • 1
  • 50
  • 8
  • 0
  • 14
  • 34
  • 0
  • 5
  • 0
  • 26
  • 0
  • 1
  • 0
  • 1
  • 0
  • 0
  • 0
  • 9
  • 27
  • 16
  • 1
  • 1
  • 6
  • 9
  • 0
  • 0
  • 0
  • 0
  • 0
  • 1
  • 0
  • 9
  • 1
  • 5
  • 1
  • 0
  • 16
  • 0
  • 2
  • 8
  • 0
  • 1
  • 37
  • 15
  • 0
  • 86
  • 4
  • 0
  • 0
  • 11
  • 37
  • 0
  • 68
  • 0
  • 1
  • 12
  • 0
  • 0
  • 0
  • 0
  • 3
  • 79
  • 0
  • 0
  • 0
  • 6
  • 40
  • 85
  • 528
  • 0
  • 0
  • 0
  • 1
  • 25
  • 0
  • 0
  • 0
  • 2
  • 0
  • 0
  • 7
  • 0
  • 0
  • 0
  • 0
  • 8
  • 6
  • 90
  • 22
  • 2
  • 5
  • 7
  • 10
  • 5
  • 1
  • 14
  • 0
  • 0
  • 0
  • 0
  • 1
  • 1
  • 0
  • 29
  • 0
  • 7
  • 1
  • 0
  • 0
  • 6
  • 0
  • 81
  • 0
  • 0
  • 0
  • 6
  • 2698
  • 6
  • 0
  • 0
  • 7
  • 0
  • 6
  • 0
  • 5
  • 9
  • 0
  • 0
  • 10
  • 0
  • 6
  • 3
  • 9
  • 0
  • 2
  • 0
  • 0
  • 3
  • 0
  • 1
  • 0
  • 10
  • 61
  • 0
  • 0
  • 0
  • 2
  • 259
  • 2
  • 24
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 30
  • 9
  • 0
  • 881
  • 17
  • 3
  • 0
  • 3
  • 2
  • 113
  • 0
  • 92
  • 3
  • 1
  • 7
  • 0
  • 0
  • 1
  • 0
  • 0
  • 2
  • 0
  • 0
  • 0
  • 2
  • 8
  • 5
  • 1
  • 1
  • 0
  • 0
  • 18
  • 0
  • 0
  • 1
  • 0
  • 0
  • 0
  • 0
  • 13
  • 0
  • 0
  • 1
  • 1
  • 1
  • 6
  • 0
  • 2
  • 0
  • 0
  • 0
  • 1
  • 50
  • 8
  • 0
  • 14
  • 34
  • 0
  • 5
  • 0
  • 26
  • 0
  • 1
  • 0
  • 1
  • 0
  • 0
  • 0
  • 9
  • 27
  • 16
  • 1
  • 1
  • 6
  • 9
  • 0
  • 0
  • 0
  • 0
  • 0
  • 1
  • 0
  • 9
  • 1
  • 5
  • 1
  • 0
  • 16
  • 0
  • 2
  • 8
  • 0
  • 1
  • 37
  • 15
  • 0
  • 86
  • 4
  • 0
  • 0
  • 11
  • 37
  • 0
  • 68
  • 0
  • 1
  • 12
  • 0
  • 0
  • 0
  • 0
  • 3
  • 79
  • 0
  • 0
  • 0
  • 6
  • 40
  • 85
  • 528
  • 0
  • 0
  • 0
  • 1
  • 25
  • 0
  • 0
  • 0
  • 2
  • Capacity
  • 2567
  • 3395
  • 2382
  • 2456
  • 2567
  • 3395
  • 2382
  • 2456
  • Product Certificates
    Solar
0 Suppliers

Macedonia

Solar Market Outlook in North Macedonia

North Macedonia, The Former Yugoslav Republic of Macedonia and its government are serious about shifting to a clean and renewable energy source to meet its energy demand. In fact, they have doubled their effort to transition to solar and renewables by boosting its installed energy production capacity. Their current goal is to generate 50% of its total energy production from renewables by 2024. 

The renewable energy drive is a priority for Prime Minister Zoran Zaev. He has cited environmental protection and green development as part of his main priorities. The economy minister of Macedonia also believes that the energy sector in Macedonia will grow at a faster rate such that it is on track to meet its 2024 target. 

In order to achieve this goal, they plan on adding more solar PV plants with a capacity of 400 MW. It’s not just solar energy they are focusing on, though, as there are also plans to build a wind farm. The long-term advantage of boosting solar power generation is that it will increase the country’s energy independence and stability of supply. In 2021, the Ministry of Economy in Macedonia has announced its plans to launch tenders in order to encourage more solar power PV plants to be installed throughout the country. 

Solar Energy Equipment Supply Capacity in North Macedonia

Macedonia does not have its own manufacturers and producers of solar power equipment. Therefore, most of the suppliers and distributors are based in foreign destinations or you can also search for them online. 

Top Major Seaports & Logistics in Macedonia

Macedonia is home to various seaports that facilitate commercial, logistics, and trade activity. These ports are the best options to transport solar power equipment to Macedonia: Bitola, Lozovo, Veles, Prilep, and Gevgelija.

PV System Design used for below projects in Macedonia

No Projects Found

PV System Design

PV System Design

  • The PV module converts sunlight into DC electricity.
  • Solar charge controller regulates the voltage and current coming from the PV panels going to the battery and prevents battery overcharging and prolongs the battery life.
  • Inverter  converts DC output of PV panels or wind turbines into a clean AC current for AC appliances or fed back into the grid line.
  • Battery stores energy for supplying electrical appliances when there is a demand.
  • Load  is electrical appliances that are connected to solar PV systems such as lights, radio, TV, computer, refrigerator, etc.
  • Auxiliary energy sources – is diesel generator or other renewable energy sources.

 

PV System Design Services includes: 

  • Determine power consumption demands
  • Size the PV panel
  • Inverter sizing
  • Battery sizing
  • Solar charge controller sizing
  • Engineering drawing